You're currently viewing our forum as a guest. This means you are limited to certain areas of the board and there are some features you can't use. If you join our community, you'll be able to access member-only sections, and use many member-only features such as customizing your profile, sending personal messages, and voting in polls. Registration is simple, fast, and completely free.


Join our community!


If you're already a member please log in to your account to access all of our features:

Username:   Password:
Add Reply
Use of Concrete Pump Truck; Use of Concrete Pump Truck
Topic Started: Dec 28 2015, 06:34 PM (137 Views)
daswell011


The application of concrete pump truck has some items needing to pay attention to. Today, Daswell will summarize some using notes for vast concrete batching plant users.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:portable cement mixer,concrete batching plants,concrete mixer,blocking making machine,concrete pump,etc.

Concrete conveying pump is also named concrete pump mini concrete batching plant for sale, and it is composed of pumping body and delivery pipeline. Concrete pump is a machine which uses the pressure to pump concrete continuously along the pipeline. Concrete pump machine is used to housing construction, bridges and tunnel construction.

concrete pump

1. Concrete pump truck can be driven by the traction of motor vehicles, but it can not carry anything and the speed of pulling must not be faster than 8km/h. The pressure of the safety valve in the hydraulic system of concrete pump truck must conform to the requirements of instruction book. The users of concrete batching plant must not be changed.

2. In hot season, it is necessary to prevent the oil temperature too high when operating. If the temperature has achieved to 70℃, stop the concrete pump truck or take other cooling measures. The staff can not climb or ride on the pipeline, especially when working in the air.

3. After the delivery of concrete, clean the equipment in time. Before cleaning, several strokes of anti-pumping can reduce the pressure in the delivery pipe, which can avoid the accident. Operators must timely clean up the hopper and other delivery pipes.